Bay Delta Conservation Plan (BDCP)
On August 26, 2015, the CA Department of Water Resources (DWR) and the U.S. Bureau of Reclamation (USBR) submitted a SWP/CVP water rights change petition to the State Water Resources Control Board (SWRCB) to authorize the installation of three new diversion intakes on the Sacramento River, each with a diversion capacity of 3,000 cfs for a total of 9,000 cfs. This is one of the initial steps necessary for the CA WaterFix to proceed with its preferred Alternative 4A to export water from the north Delta. The SWRCB has not announced dates for any hearings to demonstrate that the change will not injure any legal user of the water involved, but their website has a Facts Sheet to provide some preliminary details regarding petition process and relationship to the update of the Bay-Delta Water Quality Plan which is currently underway. They say future information will be provided regarding how the public can provide input on this petition, but does anticipate that it will notice an evidentiary hearing where parties will have the opportunity to present evidence and argument about whether and under what conditions the petition should be approved. The public record for the hearing would then serve as the basis for the SWRCB's decisions regarding approval of the petition authorizing the project.
DWR released a revised EIR/EIS for BDCPwith three new alternatives added, including a new modified Preferred Project (Alt. 4A), which are being recirculated for public review with deadline to submit comments by August 31, 2015. Alternative 4A (CA WaterFix), replaces Alternative 4 as the State's Preferred Project, and reflects the Governor's recent announcement to separate the conveyance facilities and habitat restoration measures into two individual efforts: CA WaterFix and CA EcoRestore. Two public meetings will be held in an Open House format, which means there will not be any formal presentations or panels to receive public comments, but informational exhibits and project team members will be present to answer questions. In addition to being available online, a hard copy of the revised EIR/EIS can be found at numerous locations throughout the State, or you can request a DVD copy by emailing BDCPComments@icfi.com. Following are website links to new BDCP docs particularly relevant to compliance of CA WaterFix (Alt. 4A) with 1981 Contract:
- Recirculated EIR/EIS info page , Fact Sheet, FAQS , and Press Release
- How to Navigate Revised EIR/EIS documents
- List of Revised Chapters and Appendices
- Substantive Revisions to EIR/EIS
- New Modified Preferred Alternative
- Map of Revised Tunnel Alignment
- Revised Description of Alternatives
- Revised Water Supply Chapter
- Revised Water Quality Chapter - Modeling of New Alternatives - Modeling of Increased Delta Outflows - Modeling Result ELT for Alt 4
- Appendix 3B: Environmental Commitments
- Appendix 3C: Construction Assumptions
- Appendix H: Electrical Conductivity - Attachment 1 (Sensitivity Analysis) and Attachment 2 (SJR Salinity Objective)
- Spatial Summary of Salinity Data (Map)
- Simulated Views of Intakes #2
- Locations copy of EIR/EIS is available for public review
- How to comment on revised BDCP
- Open House public meetings from 3-7 pm on July 28 in Downtown Sacramento and July 29 in Walnut Grove
Final Draft EIR/EIS - 2014
Final Comment Letter
Final Comment Letter [PDF].pdfExhibit A
1981 Contract.pdfMOU.pdfAgreement.pdfExhibit B
Vogel, D., Comments on the Public Draft Bay-Delta Conservation Plan (BDCP) and Draft BDCP Environmental Impact Report:Environmental Impact Statement (June 6, 2014).pdfExhibit C
Bourez, Walter, Report on Review of Bay Delta Conservation Program Modeling (June 14, 2014).pdfExhibit D
MBK Engineers, Technical Comments on Bay-Delta Conservation Plan Modeling (July 29, 2014).pdf[ MBK Engineers, Technical Comments on Bay-Delta Conservation Plan Modeling (July 29, 2014) ]
Exhibit E
Basye, George “The Delta Storage Concept.”(November 21, 2009).pdfReference Library:
Part A.pdfPart B (too large to post)
Part C.pdfPart D.pdfPart E.pdfDWR presentation on recent revisions to the proposed conveyance facilities (intakes, tunnels, forbays):
February 4, 2014 presentation to North Delta Water Agency BoardDelta Protection Commission Animation of BDCP North Delta Intakes
(Posted May 2014)
Department of Water Resources:
Revised Intake #3 (top) and Revised Clifton Court Forebay (bottom)